John S. Stanley,
Ph.D.
Group Vice President,
Business Development
(816) 753-7600,
ext. 1160
How a PEMS Works
Advantages of PEMS
Applications for Gas Turbines
Data Collection and Analysis
System Integration
Regulatory Support
|
MRI’s air quality specialists are well-qualified
to provide technical and regulatory support for developing and installing
predictive emission monitoring systems (PEMS). Our current focus is
nitrogen oxide (NOx) and carbon monoxide (CO) emissions from gas turbines.
PEMS are cost-effective continuous monitoring systems that require minimal
operational oversight and maintenance.
Under an exclusive licensing agreement with the Gas
Technology Institute, MRI offers a PEMS to monitor NOx and CO emissions
from gas turbines. MRI's PEMS are directly applicable to GE Frame 3
and Rolls Royce Avon gas turbines. These PEMS algorithms can be easily
adapted to other gas turbine models.
- Gas turbine technology
- Emissions and process data collection
- Data analysis
- Predictive model development
- Emissions monitoring regulations
- Predictive emissions models use combustion principles
to correlate emission rates to operating state of gas turbine
- Parameter inputs to model provided from existing
instrumentation
- Real-time emissions calculated from operating parameters
- Cost-effective continuous monitoring system
- Minimal operation and maintenance requirements
- No calibration gases
- No emissions analyzers
- No exhaust gas sampling and conditioning system
- Diagnostic and trending capabilities
- Software-based system
Complete monitoring—NOx, CO, O240
- CFR 75
- 40 CFR 60
- Open market trading
- State and local regulations
- Compliance assurance monitoring (CAM)
- Experimental design and test planning
- Data collection testing
- Linear and nonlinear regression analyses for predictive
emissions model development
- Statistical analyses and relative accuracy calculations
- Certification testing (RATA)
- Data acquisition from PLC or DCS
- Data validation procedures
- Emissions calculations
- Report generation
- Definition of site-specific monitoring and reporting
requirements
- Monitoring protocol preparation
- Description of system and operation
- Summary of compliance test results
- QA/QC plan
- Record keeping and reporting
- Presentation to regulatory agencies
back to top
|